Activewear Development Process
Start with a tech pack, reference product or product direction. Each stage has a clear review point before the project moves forward.

Three ways to begin.
You do not need every detail ready for the first conversation. Share the information you have. Tech pack checklist
A tech pack
Share technical drawings, measurements, materials and construction details for review.
Start with a tech packA reference product
Send a product photo, link or sample, along with the details you want to develop.
Start with a referenceA product idea
Describe the category, intended activity, look and wearing experience you have in mind.
Start with an ideaFrom brief to bulk production.
Use the decision at each stage to keep product development, sample feedback and production expectations aligned. Sampling cost and timeline
Brief review
Review the product category, intended use, construction direction and information already available.
REVIEW & CONFIRMConfirm the suitable route: Cut & Sew, Seamless or both.
Material & structure
Align fabric or yarn, trims, pattern shape or knit structures with the required fit and function.
REVIEW & CONFIRMConfirm the development specification before sampling.
Sample development
Develop a sample for review. Approximate sampling time is 12–15 days, subject to style complexity.
REVIEW & CONFIRMReview fit, movement, appearance and workmanship. Record the feedback.
Refinement & approval
Review required adjustments and record the final sample and specifications as the production reference.
REVIEW & CONFIRMApprove the sample, materials, measurements and production details.
Bulk production
Move approved specifications into production, with checks at relevant material, production and finishing stages.
REVIEW & CONFIRMCheck finished goods against the agreed product and inspection requirements.
Keep one clear approval reference.
The approved sample and recorded specifications guide the production and inspection work. Confirm the details together before production proceeds.
- Approved sample
- The agreed garment version and any final review notes.
- Measurements & fit
- Key dimensions, size requirements and agreed fit changes.
- Materials & color
- The selected fabric or yarn, trims and color direction.
- Construction
- Seams, openings, panels or programmed knit details.
- Branding & packing
- Logo placement, labels, folding and packing details.
- Inspection requirements
- The agreed checks and acceptance criteria for the order.
One process. Two development routes.
The review stages stay clear, while material choices and construction work follow the route your product needs.

Cut & Sew
Develop fabric choice, pattern shape, panels, trims, stitch methods and garment fit.
Explore Cut & Sew
Seamless
Develop yarn direction, knit structures, compression zones, stretch and close-to-body fit.
Explore SeamlessSend your product direction.
Tell us where you are starting. We can review the suitable route and the next information needed before detailed files follow.
Product category, intended activity, reference style and any material, fit or quantity requirements already available.